Public Works Department

Doral Boulevard Median Landscape Improvements

The City of Doral will begin the construction of Phase 1 of the Doral Boulevard Median Landscape Improvements along Doral Boulevard between Homestead Extension of Florida’s Turnpike (HEFT) and NW 97 Avenue on June 25, 2018 with an expected duration of 6 months.

SCOPE OF IMPROVEMENTS: Landscaping improvements to include an irrigation system, lighting system in the median, and new landscaping improvements as per the Doral Boulevard Beautification Master Plan.

ANTICIPATED IMPACTS: Work will be within the median and any traffic disruption along Doral Boulevard should be minimized using approved Maintenance of Traffic plans. There are no anticipated detours and all work should be confined to closures of the inside lane during off-peak hours.

Doral Blvd Beautification

PHASE 1 IMPROVEMENTS (HEFT TO NW 97 AVE):
  • To commence on June 25, 2018
  • Project has a 6 month duration

PHASE 2 IMPROVEMENTS (NW 97 AVE TO SR 826)
  • Currently under design with an anticipated completion of early 2019

NW 54 Street Roadway Improvements

Roadway reconstruction of NW 54 Street from NW 87 Avenue to NW 79 Avenue. Construction includes installation of a stormwater drainage infrastructure, curb and gutter, lighting, water and sanitary facilities, landscape, and irrigation.
Duration: Currently under construction with anticipated completion date of May 2018.

NW 79 Avenue and NW 33 Street Intersection Improvements

Intersection Improvements including signalization for the intersection of NW 79th Avenue and NW 33rd Street, within the City of Doral as well as Maintenance of Traffic, clearing and grubbing, curb and gutter, sidewalk, roadway base and stabilized subgrade, milling, paving, roadway signing and pavement markings and signalization.
Duration: Currently under construction with anticipated completion date of November 2017.

Resurfacing Projects
NW 82 Avenue from NW 12 Street to NW 25 Street

Milling and resurfacing of NW 82 Avenue between NW 12 Street and NW 25 Street to include removal and replacement of sidewalks, curb and gutter, miscellaneous stormwater improvements, and milling and resurfacing of bituminous paving.
Duration: Completed

Resurfacing Projects
NW 102nd Ave. and NW 45th St., NW 102nd Ave. from NW 15th Terr. to NW 25th St., NW 15th Terr. from NW 102nd Ave. to NW 100th Ave., NW 100th Ave. from NW 14th St. to NW 15th Terr., NW 14th St. from NW 100th Ave. to NW 98th Ct. and NW 98th Ct. from NW 12th St. to NW 14th St.

Milling and resurfacing of NW 102nd Ave. and NW 45th St., NW 102nd Ave. from NW 15th Terr. to NW 25th St., NW 15th Terr. from NW 102nd Ave. to NW 100th Ave., NW 100th Ave. from NW 14th St. to NW 15th Terr., NW 14th St. from NW 100th Ave. to NW 98th Ct. and NW 98th Ct. from NW 12th St. to NW 14th St to include removal and replacement of curb and gutter, and milling and resurfacing of bituminous paving.
Duration: Anticipated completion date of January 31 2018

NW 33 Street Sidewalk Improvements
NW 33 Street from NW 104 Avenue to Torremolinos

Construction of a sidewalk on the north side of NW 33 Street between NW 104 Avenue and Torremolinos to include sidewalk, curb and gutter, miscellaneous stormwater improvements, and milling and resurfacing of bituminous paving where necessary.
Mainline Closure: Anticipated completion December 2017

NW 74th Street

NW 74th St. from NW 107th Ave. to NW 114th Ave. – Project No. 20120004: Work includes improvement and widening to the existing road from a five-lane undivided roadway to a six-lane divided roadway, reducing the width of the existing median to accommodate a bicycle facility, sidewalks, curb and gutters, a continuous storm drainage system, pavement markings and signage, traffic signalization, roadway lighting, sound barrier walls on both sides of the roadway, landscaping, and irrigation.
Duration: Construction is anticipated to be completed by October 2017.
Mainline Closure: Motorists are advised to follow the maintenance of traffic (MOT) signs or detour route.

Police Substation Facility

Police Substation Facility (NW 97 Ave just north of NW 33 St): Design-Build of a Police Substation Facility. Adjacent roadways will be improved and traffic will be affected during construction.
Duration: Currently under construction with anticipated completion date of October 2017.

Canal Bank Stabilization Project

Project: Canal Bank Stabilization Program – Year 5A
Description: Canal bank stabilization through geo-web techniques of the Dressels Canal along NW 41 St. between NW 87 Ave. and the Palmetto Expressway, and at the east side of the Dressels Canal along NW 107 Ave. between NW 52 St. and NW 57 St. Project also includes the construction of a maintenance/pedestrian/bike shared use path along the south side of the Dressels Canal between NW 87 Ave. and NW 82 Ave.
Cost: $1,964,812.27
Schedule: NPT – 6/12/17, Completion Date – 3/9/18
Contractor: ENCO LLC

Current Projects Map