NW 54 Street Roadway Improvements

Roadway reconstruction of NW 54 Street from NW 87 Avenue to NW 79 Avenue. Construction includes installation of a stormwater drainage infrastructure, curb and gutter, lighting, water and sanitary facilities, landscape, and irrigation.
Duration: Currently under construction with anticipated completion date of May 2018.

NW 79 Avenue and NW 33 Street Intersection Improvements

Intersection Improvements including signalization for the intersection of NW 79th Avenue and NW 33rd Street, within the City of Doral as well as Maintenance of Traffic, clearing and grubbing, curb and gutter, sidewalk, roadway base and stabilized subgrade, milling, paving, roadway signing and pavement markings and signalization.
Duration: Currently under construction with anticipated completion date of November 2017.

Resurfacing Projects
NW 82 Avenue from NW 12 Street to NW 25 Street

Milling and resurfacing of NW 82 Avenue between NW 12 Street and NW 25 Street to include removal and replacement of sidewalks, curb and gutter, miscellaneous stormwater improvements, and milling and resurfacing of bituminous paving.
Duration: Currently under construction with anticipated completion date of August 2017.

NW 74th Street

NW 74th St. from NW 107th Ave. to NW 114th Ave. – Project No. 20120004: Work includes improvement and widening to the existing road from a five-lane undivided roadway to a six-lane divided roadway, reducing the width of the existing median to accommodate a bicycle facility, sidewalks, curb and gutters, a continuous storm drainage system, pavement markings and signage, traffic signalization, roadway lighting, sound barrier walls on both sides of the roadway, landscaping, and irrigation.
Duration: Construction is anticipated to be completed by August 2017.
Mainline Closure: Motorists are advised to follow the maintenance of traffic (MOT) signs or detour route.

Stormwater Improvements

NW 56 St. between NW 84 Ave. — NW 79 Ave.
NW 84 Ave. between NW 54 St. — NW 58 St.
NW 82 Ave. between NW 56 St. — NW 58 St.
On Monday, February 13, 2017, the City of Doral Public Works Department is scheduled to begin stormwater improvements along Sub Basin H-8.
Duration: Approximately 210 calendar days for Final Completion - Project completion date August.
Fact Sheet

Police Substation Facility

Police Substation Facility (NW 97 Ave just north of NW 33 St): Design-Build of a Police Substation Facility. Adjacent roadways will be improved and traffic will be affected during construction.
Duration: Currently under construction with anticipated completion date of August 2017.

NW 66 Street Roadway Improvements

New roadway construction of NW 66 Street from NW 102 Avenue to NW 97 Avenue. Construction includes installation of new stormwater drainage infrastructure, de-mucking of site, new embankment and geo-grid installation, new asphalt, and lighting.
Duration: Currently under construction with anticipated completion date of August 2017.

Canal Bank Stabilization Project

Project: Canal Bank Stabilization Program – Year 5A
Description: Canal bank stabilization through geo-web techniques of the Dressels Canal along NW 41 St. between NW 87 Ave. and the Palmetto Expressway, and at the east side of the Dressels Canal along NW 107 Ave. between NW 52 St. and NW 57 St. Project also includes the construction of a maintenance/pedestrian/bike shared use path along the south side of the Dressels Canal between NW 87 Ave. and NW 82 Ave.
Cost: $1,964,812.27
Schedule: NPT – 6/12/17, Completion Date – 3/9/18
Contractor: ENCO LLC